For the Mongolian mining and processing plant "Erdenet" a workshop substation was manufactured at our plant. We already worked with this customer in October 2019.
The workshop substation is designed for two 1600 kVA transformers.
The project uses both imported Huyndai circuit breakers and domestic circuit breakers. Our engineers have developed such a complex scheme to keep within the given budget. At the same time, our solution is fully consistent with the tasks set by the customer.
Instead of an ammeter and a voltmeter, modern multimeters are installed at the input and at the sections of the substation - devices that combine several functions. Their readings allow you to assess the quality of electricity and prevent emergencies.
At the input of the substation, it is possible to connect to SCADA - a software and hardware complex for remote control and collection of information.
The circuit uses a copper busbar, designed for currents of 5000 A.
The substation was shipped on June 1, 2020