For PJSC Rosseti Center - Tambovenergo, our plant manufactured four substations in a metal building with a capacity of 160 kVA.
⠀
Each substation is equipped with a telemechanics and electricity metering cabinet with a dispatch function. Such equipment increases the level of visibility and control of the network. KTP is completely ready to work in future digital networks.
The substations are equipped with TMG transformers manufactured by the Chekhov Transformer Plant.